25 March, 2024Comments (0)
EV Charger Case Study: How to install commercial-grade level 2 chargers.
Read More25 March, 2024Comments (0)
We recently completed a project for Carmacks Construction that is the first of its kind in Canada: the installation of a portable DC Fast Charger by Heliox.
Read More25 March, 2024Comments (0)
Gescan’s branch management team asked BLDG to install two Core+ Max 19.2kW Level 2 EV Chargers by Flo in their parking lot. Here are the details.
Read More25 March, 2024Comments (0)
We were recently hired by GO Kia to install a series of chargers to its dealership grounds including a EV3000 Bosch DC Fast Charger.
Read More25 March, 2024Comments (0)
We were recently hired by a homeowner in Beaumont with the goal of powering their home with solar.
Read More25 March, 2024Comments (0)
We recently helped this homeowner whose goal was to completely eliminate their electricity bill. Here’s how.
Read More13 February, 2024Comments (0)
When we map out new projects with clients, an important component is looking at tax, grants and funding incentives. Here’s what we did for Bee-Clean.
Read More31 January, 2024Comments (0)
We were recently hired by a homeowner in the Wolf Willows neighbourhood of Edmonton to help them achieve their goal of powering their home and EV entirely with solar.
Read More30 January, 2024Comments (0)
Solar Case Study: How to implement a high-performance solar PV system that is both portable and scalable over time.
Read More24 January, 2024Comments (0)
We recently installed an 8.3kW solar PV system for this homeowner. This assignment was a unique solar project because the client required a panel upgrade to accept the solar production.
Here’s all you need to know and a few planning tips.